EXISTING WATER USE EFFICIENCY (WUE) PROGRAM

GOALS 4.3.3

  •  Water Use per ERU Goal: Decrease the planning ERU value (gpd/ERU) one percent annually from the current planning ERU value of 182 gpd/ERU, which is the 75th percentile of eight years of historical data (2015 – 2022). Revaluate goal when the planning ERU value reaches less than 172 gpd/ERU.
  • To be conservative, an ERU planning value higher than the average was used by the City for demand forecasting. The 75th percentile of the eight-years of data was used to select the planning ERU value of 182 gpd. This methodology is consistent with the City’s 2015 Plan. The ERU value of 182 gpd is seven percent lower than the 2015 Plan’s ERU planning value of 195 gpd per ERU.
  •  MDD/ADD Peaking Factor: Decrease the planning peaking factor from the current 1.77, which is equal to the 75th percentile of eight years of historical data (2015-2022), to a planning peaking factor of less than 1.68, the average peaking factor from 2015-2022.
  •  Distribution System Leakage: Maintain three-year average DSL under ten percent to minimize water waste.
  • Customer Support: Provide the service and support necessary to those water customers expressing a desire to conserve water as a part of their environmental ethic and as a means of minimizing water bills

WATER SAVED AS A RESULT OF THE WUE MEASURES OVER THE LAST 6 YEARS 4.3.1

  1. Compared average daily per-capita water demand from 2021 through 2025.
  2. Measured the reduction in gallons per person per day from one year to the next.
  3. Multiplied those daily savings by the population for each year.
  4. Multiplied the result by the number of days in each year.
  5. Added the annual savings together for the six-year period.
  6. Using 2019 (106 GPD) as the baseline:

Table 4-3 | Annual Average Day Demand (gpd) per Capita

Year

Demand (GPD)

Reduction from 2017

2017

112

0

2018

109

3

2019

106

6

2020

100

6

2021

105

1

2022

103

3

2023

105

1

2024*

102

4

*The 2024 demand calculation was based on the adjusted population served in accordance with clarification by the Department of Health.


EDUCATION 4.3.4

1. School Outreach: The City will continue to participate in programs arranged to educate students on efficient water usage as requested by schools.

2. Speakers’ Bureau: The City will seek speaking opportunities to discuss efficient water use with a wide audience spectrum. Topics could include water efficient fixtures and appliances, curbing seasonal peak demands, lawn watering practices, etc.

3. Program Promotion: The City will seek opportunities for social media, television, and/or radio public service announcements for WUE and submit news articles to local papers and Auburn Magazine on efficient water usage especially during the spring and summer months.

4. Theme Shows/Fairs: The City hosts an annual Kids Day fair. The fair includes a wide range of activities for all ages of kids. As part of the fair, the City has fun, water-related activities and provides water efficiency brochures and other materials. The City will conduct outreach at other Theme Shows/Fairs if requested. Water saving device kits are distributed to interested single-family and multiple-family residential customers.

5. Water Audits: The City will conduct a water audit upon the request of a customer, including industrial, commercial, and institutional customers. The audits will review items such as: recirculation of cooling water, reuse of cooling and process water, reuse of treated wastewater, efficient landscape irrigation, low water using fixtures, fixing leaks, and process modifications.

6. Customer Leak Detection: The City identifies potential leaks through investigation of the water meter upon request of customers. The City runs multiple reports in the AMI system to analyze data and investigate water meters to identify leaks.

7. Bills Showing Consumption History: The City will continue to provide customer bills showing the previous year’s water usage. The City provides water usage information from AMI on the customers e-portal.

8. Water Saving Device Kits: The City will participate in distribution of water use efficiency kits through education events such as speakers’ bureaus, theme shows, fairs, and through bill insert request forms.

9. WUE Pricing: The City has an inverted block rate structure for single-family residential customers to encourage WUE. The City will consider WUE in future cost of service/rate studies. Studies should determine the most appropriate water structures and rate levels to achieve the City’s WUE goals, while generating sufficient revenues for utility operations. It is recommended that the studies consider uniform rates by class, inverted block rates, seasonal rates, and excess use rates.

10. Water Efficient Toilet Rebate Program: The City will continue to provide rebates to customers that replace old toilets with new high-efficiency toilets through their Environmental Protection Agency (EPA) WaterSense Toilet Rebate program.

11. Low-Flow Shower Heads Giveaways: The City gives away free low-flow shower heads at the Utility Billing Counter.

12. School Outdoor Water Use Reduction: The City will target schools to reduce their outdoor water consumption. Water audits and education on the benefits of replacing inefficient irrigation systems or landscaping (including turf) will be conducted.

13. City Water Use Reduction: The City will audit the water use of City accounts to identify both indoor and outdoor water saving opportunities. The Water Utility staff will help educate City account holders on WUE; however, no water budget has been allocated to implement water saving devices at City facilities outside of planned capital improvements.

14. Rainwater Harvesting: The City will evaluate implementation of a rainwater harvesting (rainwater reclamation) promotion program as a means to reduce irrigation water usage by commercial, public, and residential customers. The City’s Stormwater Utility’s requirements to use Low Impact Development (LID) measures, where feasible, strives to keep rainwater on the property, further reducing irrigation demands.


PROJECTION OF WHAT THE WUE MEASURES WILL SAVE  4.4

Table 4-5: Demand Forecast With and Without Projected WUE Savings

ADD (mgd)
Year Without WUE With WUE Savings % Savings

2024

7.05

6.98

0.07

1%

2025

7.14

6.99

0.14

2%

2026

7.22

7.00

0.22

3%

2027

7.31

7.01

0.29

4%

2028

7.39

7.02

0.37

5%

2029

7.48

7.03

0.45

6%

2030

7.57

7.04

0.53

7%

2031

7.66

7.05

0.61

8%

2032

7.75

7.06

0.70

9%

2033

7.85

7.06

0.78

10%

2034

7.95

7.07

0.87

11%

 

 

   MDD (mgd)
 Year Without WUE With WUE Savings % Savings
 2024

12.47

12.34

0.12

1%

 2025

12.61

12.36

0.25

2%

 2026

12.76

12.38

0.38

3%

 2027

12.91

12.39

0.52

4%

 2028

13.06

12.41

0.65

5%

 2029

13.22

12.43

0.79

6%

 2030

13.38

12.44

0.94

7%

 2031

13.54

12.46

1.08

8%

 2032

13.70

12.47

1.23

9%

 2033

13.87

12.48

1.39

10%

 2034

14.04

12.50

1.54

11%


DISTRIBUTION LEAK INFORMATION  4.2

Distribution System Leakage

Distribution System Leakage (DSL) represents the difference between production and documented water use (retail, wholesale, and authorized unmetered). It may include inaccurate master and service connection meters, unaccounted-for non-revenue water use, pipeline leakage, and unauthorized use. DSL does not include authorized water usage such as water used for fire protection, flushing, construction, and other maintenance and operations practices. However, to be credited, this must be accounted for by metering or estimating using credible means.

The DSL is calculated as the difference between the total amount of water produced and the sum of water sold plus any authorized unmetered water usage. The City’s estimated DSL for 2015 through 2022 is presented in Chapter 2, Table 2-11. For the City’s water system, the 2022 three-year rolling average DSL was 6.7 percent of total production (corrected value submitted by the City to DOH in 2024). This falls below the DOH requirement that the three-year average DSL be under ten percent to minimize water waste.

The City is committed to maintaining DSL below the required ten percent and is actively working to identify and minimize DSL. To minimize DSL, the City has ongoing leak detection, meter calibration, and an active repair and replacement program for water system infrastructure, as detailed in Chapter 6 – Operations and Maintenance. The City completes a leak detection study of 25 percent of the water distribution system every year to detect and fix leaks. Additionally, the City has recently increased its efforts to reduce non-payment of bills and water theft. The City completed a major Supervisory Control and Data Acquisition (SCADA) system upgrade in 2024.  The SCADA system is a computerized monitoring and control system that allows the City’s Maintenance and Operation (M&O) staff to remotely monitor, operate, and control water system facilities in real time.

These investments should significantly increase the City’s ability to measure DSL both temporally and geographically. The resulting information may allow the City to better target its WUE activities to reduce DSL.


WATER LOSS CONTROL ACTION PLAN Chapter 4, Table 4-1

Auburn is currently not required to develop a formal Water Loss Control Action Plans because the three-year rolling average distribution system leakage (DSL) remains below the Washington State Department of Health’s 10% threshold. The City continues proactive water loss reduction efforts including leak detection, meter calibration, watermain repairs, and infrastructure maintenance and replacement. 


HOW THE PROGRAM WAS EVALUATED 4.3.1

Program Requirements

The WUE requirements emphasize the importance of measuring water usage and evaluating the effectiveness of the City’s program. There are three fundamental requirements of a WUE Program that the City follows.

  • Planning Requirements – Municipal water suppliers are required to:
  • Collect data.
  • Forecast demand.
  • Evaluate WUE measures.
  • Calculate DSL.
  • Implement a WUE Program to meet their goals.

Distribution Leakage Standard – Municipal water suppliers are required to meet a distribution system leakage standard to minimize water loss from their distribution system.

Goal setting and performance reporting – Municipal water suppliers are required to set WUE goals through a public process and report annually to their customers and DOH.


PREVIOUS WATER USE EFFICIENCY (WUE) REPORTS

2020 2021 2022 2023 2024 2025


Other Resources:

Draft Water System Plan, May 2025: Draft Water System Plan, May 2025 & Appendices

*The updated Water Use Efficiency (WUE) Program can be found in Chapter 4.

2021 Water Use Efficiency (WUE) Program (Resolution 5603): Resolution No. 5603 - 2021-2026 Water Use Efficiency Program


WATER SUPPLY CHARACTERISTICS INFO 2.5

The City has a diverse water supply consisting of two springs, ten wells and an emergency intertie with the City of Tacoma; refer to the Existing Facilities Figure provided in Chapter 1 (Figure 1-3). The City’s aquifer characteristics are described in several sources; this section draws mainly from the Conceptual Mitigation Plan (CMP) for Water Right Application G1-28404, provided in Appendix S.

Wells 1, 2, 3A, 3B, 4, 6, and 7 are in the lower alluvial aquifer in the Auburn Valley, referred to as the Valley Wellfield. This wellfield is mostly confined by the Osceola Mudflow, an important aquitard in the Auburn Valley depicted in Figure 4 of the CMP. Groundwater discharge from the upland aquifers is the primary source of recharge to the lower alluvial aquifer, which hosts all the City’s wells. Groundwater generally moves upward in the valley aquifers and moves horizontally at approximately one to four feet per day.

Alluvial groundwater from the White River also recharges the Green River alluvial aquifer. Groundwater in the vicinity of Wells 2, 6, and 7 discharges into the Puget Sound via the Green River and the Duwamish River valley. Wells 2, 6, and 7 are located northeast of downtown Auburn and collectively referred to as the Fulmer Wellfield. Wells 1, 3A, 3B, and 4 are in the White River Drainage Basin and Wells 2, 6, 7 and West Hill Springs are in the Green River Drainage Basin.

Wells 3A, 3B and 7 are not currently in use due to high manganese concentrations, however the City plans to install manganese treatment at each of these facilities to bring them back online. The City has a pending water right application for 13,443 acre-feet per year from the existing Wells 6 and 7 and a future Well 8.

The City has sufficient water rights to meet current demands, 10-year, and 20-year demand projections, as shown in the Water Rights Self-Assessment Form provided in Appendix I. Mitigation obligations due to the proposed water right for Wells 6, 7, and 8 are listed below and are described in detail in the CMP:

  • Mitigation of impacts to Green River,
  • Mitigation of impacts to White River, and
  • Mitigation of impacts to Mill Creek.

Wells 5, 5A, and 5B are in the Upland Wellfield and constructed within the Lakeland Service Area. The upland aquifers are recharged through precipitation and leakage from Lake Tapps and discharge into the White River system. Once Well 5B came online, the City discovered that the aquifer was not recovering.

Well 5B has been offline since 2006. The safe yield of Wells 5 and 5A have been decreased from their design capacity due to a drop in the aquifer’s capacity. Specific information on the individual wells and their associated water rights are provided in Section 3.4.1.

West Hill Springs draws from an unnamed confined aquifer. The spring source water flows by gravity into the Valley Service Area, although flows vary depending on aquifer conditions, and discharges into Mill Creek, which flows into the Green River.

Coal Creek Springs is the largest active water supply for the City and draws from a confined aquifer, however its flow varies depending on aquifer conditions. Coal Creek Springs collection system is located at the base of Lake Tapps Upland and is in the White River Drainage Basin. Further aquifer details are provided within the Wellhead Protection Program (WHPP) provided as Appendix T.

The City also owns two additional wells: the Algona Well 1 and the Braunwood Well. Algona Well 1 was acquired by the City in 1996 but has since been taken offline due to operational issues.

The City plans to use a groundwater flow model being developed by the USGS to predict potential impacts to surface water.


WATER DEMAND FORECAST INFORMATION  2.7 and 2.8

Table 2-23: ADD, MDD, and ERUs Summarized by Service Area with Wholesale Included

 

2024

2034

2044

Lea Hill

Average Day Demand (mgd)

1.00

1.04

1.09

Maximum Day Demand (mgd)

1.77

1.84

1.92

Equivalent Residential Units

5,506

5,729

5,966

Valley

Average Day Demand (mgd)

5.11

5.84

6.72

Maximum Day Demand (mgd)

9.02

10.31

11.88

Equivalent Residential Units

28,034

32,037

36,920

Lakeland

Average Day Demand (mgd)

0.51

0.59

0.67

Maximum Day Demand (mgd)

0.91

1.04

1.19

Equivalent Residential Units

2,815

3,217

3,684

Academy

Average Day Demand (mgd)

0.43

0.48

0.54

Maximum Day Demand (mgd)

0.76

0.85

0.95

Equivalent Residential Units

2,375

2,642

2,946

Total Retail Customers

Total Average Day Demand (mgd)

7.05

7.95

9.02

Total Maximum Day Demand (mgd)

12.47

14.04

15.94

Total Equivalent Residential Units

38,731

43,626

49,515

Algona (Firm Wholesale)

Total Average Day Demand (mgd)

0.365

0.386

0.409

Total Equivalent Residential Units, ADD1

2,005

2,120

2,246

Total Maximum Day Demand (mgd)

0.692

0.732

0.775

Total Equivalent Residential Units, MDD1

2,150

2,274

2,409

Retail Customer Demand with Algona (Firm Wholesale)

Total Average Day Demand (mgd)

7.42

8.33

9.43

Total Maximum Day Demand (mgd)

13.16

14.77

16.71

Retail with Firm Wholesale (Algona and MIT Fish Hatchery)

Total Average Day Demand (mgd)

9.92

10.83

11.93

Total Maximum Day Demand (mgd)

14.66

16.27

18.21

Retail with Firm & Interruptible Wholesale (Algona, MIT Fish Hatchery, and LMWD)

Average Day Demand (mgd)

12.42

13.33

14.43

Maximum Day Demand (mgd)

17.16

18.77

20.71

Note:

1. The Algona ERU values were calculated using the City of Algona’s projected demand and the City of Auburn’s ERUADD and ERUMDD factors.

SUMMARY OF COMMENTS RECEIVED AND CITY RESPONSES